Skip to main content

SMBs & agencies · Subcontractor not delivering

Subcontractor fails to finish — self-remedy under § 637 BGB

The site is at a standstill, the subcontractor does not respond — and your own client is waiting. Before you instruct another firm, a deadline determines who bears the costs.

No credit card · 10 credits free · Cancel anytime

Deadline at a glance

Reasonable additional deadline — before instructing any third party

§ 637 Abs. 1 BGB

There is no fixed statutory deadline in days. What matters is that you set a reasonable deadline for subsequent performance and wait for it to expire without result before instructing a third-party firm. Only in the cases of § 637 Abs. 2 BGB — in particular a serious and final refusal — is setting a deadline unnecessary.

It is an AI, not a person: nobody looks at your individual case, and we do not know who signs up or for what reason. That is why we give pointers, but no legal advice on the individual case. Guidelines and playbooks in the platform are only guardrails: the AI relies on the available sources and your information. AI can make mistakes — check important results, and if in doubt, ask a lawyer.

Typical risks in this scenario

What we pay special attention to

Curated from real cases. The AI review flags exactly these points in your document.

  • A third-party contractor was commissioned before the additional deadline had expired — reimbursement of costs under § 637 Abs. 1 BGB requires that a deadline was set without success.

  • Delay and defect mixed up: before acceptance, the claim to performance is in the foreground; the warranty rights under § 634 BGB generally only apply afterwards.

  • VOB/B not checked — then § 4 Abs. 7 VOB/B (before acceptance) and § 13 Abs. 5 VOB/B (afterwards) apply instead of the BGB route.

  • Termination for good cause without a sound reason: it is treated as a termination for convenience (§ 648 BGB) — you then owe the full remuneration less expenses saved.

  • Substitute performance destroys the evidence: without prior documentation or independent evidentiary proceedings (§ 485 ZPO), you bear the risk of proof.

  • No advance payment demanded under § 637 Abs. 3 BGB, and the remedial work pre-financed out of your own pocket.

  • The subcontractor's work has already been accepted without reservation — rights regarding known defects are lost (§ 640 Abs. 3 BGB).

  • Additional costs not set off against the security retention and the outstanding final invoice, although set-off was possible.

What you can do here in 5 minutes

If you instruct a third-party firm before a reasonable deadline has expired without result, you are regularly left to bear the additional costs — that is the most expensive mistake in this situation. The law distinguishes two cases that proceed entirely differently: if the work is not yet finished, the issue is default (Verzug) and damages in lieu of performance (§ 281 BGB). If it is finished but defective, the rights for defects under § 634 BGB apply and with them self-remedy (Selbstvornahme) under § 637 BGB — including a right to an advance payment, so that you do not have to pre-finance the remedying of defects (§ 637 Abs. 3 BGB). If the VOB/B has been incorporated, a third path applies.

Upload the subcontract, the bill of quantities, your list of defects and the correspondence — we classify the case as default or as a defect, check whether the VOB/B path applies, draft the notice with a deadline and an announcement of self-remedy, and structure the statement of additional costs.

How it works

Results in three steps

1

Upload your documents

Subcontract, bill of quantities, list of defects, correspondence.

2

Classify the case

Default or defect? BGB or VOB/B? The deadline and the legal basis of the claim depend on this.

3

Set a deadline and announce

Notice with a specific date, a demand for an advance payment and an announcement of self-remedy.

What you get
  • Upload your documents – Subcontract, bill of quantities, list of defects, correspondence.
  • Classify the case – Default or defect? BGB or VOB/B? The deadline and the legal basis of the claim depend on this.
  • Set a deadline and announce – Notice with a specific date, a demand for an advance payment and an announcement of self-remedy.
What it is not
  • No technical assessment of whether a defect exists or which repair is needed — an expert clarifies that.
  • No statement of how many days a reasonable deadline has; that depends on the trade, the stage of construction and the season.
  • No check whether the third-party firm's prices are usual in the locality and therefore necessary within the meaning of § 637 Abs. 1 BGB.
  • No preservation of evidence and no representation in independent evidence proceedings or in court.

FAQ

Common questions about this case

Transparency

What the AI checks — and what only a lawyer can decide

An AI is only as good as the question. We show openly where your answer is reliable and where you should speak with a lawyer.

Before you terminate the subcontract or withdraw the order (§ 648a BGB, § 8 Abs. 3 VOB/B), if you face a contractual penalty under your own construction contract, if the subcontractor shows signs of insolvency or if independent evidence proceedings are in prospect, you should involve a lawyer specializing in construction and architects' law.

Lex & Lexi

You ask. Lex or Lexi shows what Smart Legal Pro can do.

Product guidance right on the page — features, pricing and the best way to start.

Start free
No credit card
Get started